Topics

Project progress

What is becoming more concrete in the project – from user needs and requirements to prototypes, evaluation, governance and services.

This topic explains not merely that work happened, but which substantive results, decisions and open questions emerged from it.

Guiding questions

What we follow in this topic

  • Which problems and user needs are becoming concrete?
  • Which subject-matter and technical decisions follow, and why?
  • How do we assess accessibility, quality and usefulness rather than technical function alone?

Selected

Key starting points

Editorially highlighted posts that provide useful entry points into the central questions of this topic.

Latest

Posts in this topic

Sorted by publication time. Older posts are being editorially revised step by step.

  1. Project progressArticleFunded project period

    Project start: IncluLearn.AI now has its own public portal

    At the start of the funded project phase, the public IncluLearn.AI portal is available at inclulearn.owli-ai.com. It deliberately separates public project information, the synthetic demo and the future private pilot path.

    Published: · Event: · documented retrospectively

  1. Project progressArticlePreparation phase

    Which IncluLearn.AI services could emerge from the research

    From the needs hypotheses, we derived a first solution hypothesis: five core components with high strategic value, five subsequent production and integration services, and three specialised later options.

    Published: · Event: · documented retrospectively

  2. Project progressArticlePreparation phase

    What slows media centres down: five findings from public research

    Public workflow descriptions point to high manual effort, long lead times, subject-specific transformation, established reuse practices and special examination requirements. For IncluLearn.AI, these are concrete signals of where semantic AI support may be useful.

    Published: · Event: · documented retrospectively

  1. Project progressArticlePreparation phase

    TTS from architecture building block to public test path: six profiles and VoiceDesign on the target VM

    The TTS path has moved well beyond the first September state: the engine-neutral API now runs with Qwen3-TTS-1.7B, six neutral preset profiles and VoiceDesign on the target VM and is reachable through the public test demo. This is real integration, but not yet an audio-quality or production approval.

    Published: · Event: · documented retrospectively

  2. Project progressArticlePreparation phase

    What the IncluLearn.AI vision prototype actually shows today

    The public prototype is not the finished AI pipeline. It is an early working model for materials, review, release and accessible use. The important foundations are user goals, accessibility-first design, DE/EN and a clear distinction between demo and real functionality.

    Published: · Event: · documented retrospectively

  3. Project progressArticlePreparation phase

    From research to validated requirements: how IncluLearn.AI works with hypotheses

    Public descriptions of media-centre workflows already provide concrete evidence about effort, bottlenecks and quality requirements. IncluLearn.AI nevertheless treats the resulting needs as hypotheses until they have been validated with practice partners and users.

    Published: · Event: · documented retrospectively

  4. Project progressArticlePreparation phase

    AI may prepare — but not approve itself: four governance rules for IncluLearn.AI

    IncluLearn.AI deliberately separates AI involvement, subject review and approval. Human ownership, risk-based review, provenance and cautious data classification are intended to make AI useful without transferring responsibility to the system.

    Published: · Event: · documented retrospectively

  5. Project progressArticlePreparation phase

    Why demo operation and production operation are deliberately separated

    IncluLearn.AI's technical foundation is being built reproducibly and with clear responsibility boundaries. The public test demo can be deployed automatically, while remaining deliberately separate from later production operation with real data and stronger security requirements.

    Published: · Event: · documented retrospectively

  6. Project progressArticlePreparation phase

    Project organisation and working structure prepared

    Before the project start, central rules for collaboration, project steering, accessibility and AI use were structured, together with a concrete start plan for the first work package.

    Published: · Event: · documented retrospectively